Incident 2018/LAR/GL1/056 · NAOC · 2 Aug 2018
THERE WAS AN EVIDENCE OF 120mm HACKSAW CUT ON THE FLOWLINE. ESTIMATED QUANTITY SPILL WAS NOT RECORDED SINCE IT IS A GAS LEAK
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI