Incident 2018/SAR/029/132 · NAOC · 7 Aug 2018
IT WAS OBSERVED THAT PREVIOUS REPAIRED POINT WAS CUT OFF. SURFACE WATER AND VEGETATION WERE IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI