Incident 2018/SAR/005 · NAOC · 26 Jun 2018
THERE WAS AN EVIDENCE OF HACKSAW CUT ON THE PIPELINE. ESTIMATED QUANTITY SPILLED WAS NOT RECORDED BECAUSE IT IS A NON LEAK POINT.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI