Incident 2014/sar/355/478 · NAOC · 30 May 2014
there was a pit dug for oil theft,the pit was exposed.showing a 2'' valve installed on the pipeline @ a 12 o clock position
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI