Incident 2014/sar/350/473 · NAOC · 27 May 2014
There was a dug pit by unknown persons for theft activity,the pit was exposed and a 3'' valve was installed on the line at a 12 o clock position
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI