Incident 2014/SAR/341/460 · NAOC · 23 May 2014
UNKNOWN PERSONS REMOVED A 6'' CONE USED FOR A PREVIOUSLY REPAIRED POINT AND INSTALLED A 3'' VALVE ON THE POINT FOR OIL THEFT ACTIVITIES.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI