Incident 2104692 · SPDC · 24 Jun 2018
• The surroundings and soil around the incident point was impacted and trenches were used to curtail any spread of crude. • The Joint Investigation Team visually observed that the 5th bolt on the 18x54’’ Clamp was tampered with by unknown persons. • A 55mm clearance between the bolt and the clamp base was also noticed. • The impacted area was within the company’s right of way. • The JIV was conclusive with no disruption at the time of investigation
Continue through records connected by state or company. Similar records do not necessarily describe the same event.