Incident 2014/SAR/228/315 · NAOC · 12 Apr 2014
1. UNKNOWN PERSONS INSTALLED 8'' VALVE ON THE SPILL POINT AT 12O'CLOCK POSITION AND IT WAS LEAKING. 2. SPILL IMPACT WAS NAOC ROW AND ADJOINING WATER BODY AND VEGETATION.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI