Incident 2018/LAR/054/071 · NAOC · 18 Apr 2018
THERE WAS AN EVIDENCE OF ABOUT 100mm HACKSAW CUT @ (12-3) O'CLOCK POSITON (8m APART) ON THE F/L
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI