Incident 2014/SAR/209/292 · NAOC · 5 Apr 2014
UNKNOWN PERSONS INSTALLED 3" VALVE WITH T CONNECTION ON THE PIPELINE AT 12 O CLOCK POSITION FOR OIL THEFT ACTIVITIES.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI