Incident 2014_1157398 · SPDC · 9 Apr 2014
10 No. 2'' valves were seen installed on pipeline for bunkering activities. 7 points were clamped, 1 point was capped, 2 points were left untouched.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.