Incident 2014/SAR/120/168 · NAOC · 18 Feb 2014
The incident occurred on a previously vandalised point (drilled hole) that was repaired by plugging and cementing. • Preliminary observations confirmed that the previously repaired point was not properly backfilled.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State