Incident 2014_1140727 · SPDC · 15 Mar 2014
1. Unknown persons installed 6" nipple valve at 12 O' clock position on the pipeline for oil theft activity. 2. Area of Impact covered SPDC ROW and Third party area( surrounding vegetation). Conclusion : The affected point on the pipeline was temporarily repaired by blinding of the flange and concealing of the point with coal tar due to high topographical residual pressure in the line.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.