Incident 2018/LAR/030/042 · NAOC · 24 Feb 2018
THERE WAS A BLAST @ 6 O'CLOCK POSITION ON THE PIPELINE RESULTING TO 360 DEGREES ROUND CUT. VEGETATION WAS IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI