Incident 2018/SAR/006/010 · NAOC · 20 Jan 2018
THERE WAS AN EVIDENCE OF HACKSAW CUT @ 3 O'CLOCK POSITION ON THE FACILITY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI