Incident 2013/SAR/422 · NAOC · 9 Dec 2013
3'' Valve with 2'' pipe connected to it was installed on the 18'' line at 12 o'clock position by unknown person(s) and there was slight impact of crude oil on the surrounding vegetation
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.